Can I stay in the house while you work?

Usually yes, depending on what is being touched and for how long. The things that actually force people out are the only kitchen and the only bathroom, and both can often be sequenced so the gap is short or a temporary arrangement covers it. Raise it at the first visit, because it changes the order the work is done in, not just the schedule.

What actually forces people out

Not noise, and not mess. People put up with a great deal of both.

What makes a house genuinely unlivable is losing a function it only has one of. One bathroom, out of service for a stretch. One kitchen, with no way to store or heat food. No heat in winter. No working supply of water. A staircase that has to be taken out. Everything else is an inconvenience with a workaround.

That is a useful way to look at your own project before you decide. Go through the list of things the house does that you cannot do without, and ask which of them the work interrupts and for how long. If the answer to all of them is "not at all" or "a day", staying is straightforward. If one of them is out for a fortnight, that is the conversation to have at the first visit, when the sequence can still be built around it.

Dust is the thing people underestimate

Construction dust is not like household dust. It is fine, it is abrasive, it hangs in the air for hours, and it travels through a house on the smallest pressure difference — under doors, through ceiling lights, along duct runs, up a stairwell. A single day of cutting in an unsealed room will put a film on a bookshelf two floors away.

The difference between a tolerable job and a miserable one is whether the containment was planned or improvised on the day. Planned looks like: sealed openings rather than a sheet taped over a doorway, floors protected along the route and not just in the work area, ducts and returns covered so the heating system does not distribute it, and where it is warranted, air handled so the work area is kept at lower pressure than the rest of the house.

Ask specifically what gets protected and how, and have it agreed before the first day rather than after the first mess. "We will be careful" is not a plan.

The difference is whether the containment was planned or improvised on the day.

The day, as it will actually feel

People arrive earlier than you expect. Towns set their own limits on when noisy work may happen, so it is not entirely up to anyone on site, but within those limits an early start is normal because it is how a day's work fits.

There will be vehicles, and there will be a question about where they go and where the dumpster sits — worth settling before it arrives rather than after. There will be a route in and out, and it should not be through your living room. There will be a point in the afternoon when work stops and the site gets closed down: tools away, materials stacked, openings covered, the area left safe for whoever is in the house overnight.

If a shift, a baby, a tenant or a dog means the day needs to start later or stop earlier, say so before the schedule is set rather than on the first morning. It is easy to build in and awkward to change once trades are booked.

Children, pets and other people's homes

Say on the first call who else is in the house. It is not a complication, it is an input.

Children and animals change how the site gets closed off at the end of each day, which areas stay sealed while nobody is working, and where tools and materials are stored overnight. A dog that can get into a work area is a hazard to itself and a problem for everyone. A child's bedroom on the other side of a wall being opened is a containment decision.

If the property is occupied by tenants, that is a different kind of planning again: access, notice, noise windows, and phasing so units come back into use instead of all going dark at once. Say it is occupied and how many units, because that shapes the sequence from the start.

A temporary kitchen is worth the trouble

If the kitchen is the room being done, the single most effective thing you can do is set up somewhere else to live for the duration: the fridge moved into a dining room or a garage, a microwave and a kettle on a table, a washing-up arrangement at a bathroom or utility sink, and the things you actually use every day packed where you can reach them.

It feels like a lot of effort for a temporary situation, and it is the difference between a long job that is survivable and one that ends in takeaway and resentment. The same logic applies to a bathroom: a temporary shower arrangement, or a frank agreement with a neighbour or a relative, planned rather than improvised on day four.

What makes any of this work is that it is planned into the sequence. Ask for the phasing that keeps one bathroom usable, or that brings the kitchen back into service before the last of the finishes are done. That is a scheduling decision and it has to be made before the schedule exists.

Put it in the scope, not in conversation

Containment
Which openings are sealed, how, and whether the heating system's returns are covered.
The route
How people and materials come in and out, and what is protected along it.
Working hours
Start and finish, and any day or time that has to be avoided.
The daily close-down
What state the site is left in each evening, and what is made safe.
Which rooms stay in use
Named, and for how long, with the phasing that makes it possible.
Cleaning
What gets cleaned as the job runs, and what gets cleaned at the end. Debris removal belongs in the scope too — if a bid does not mention it, ask where it went.

Related questions

How much dust and mess will there be?

Some, always. The difference between a tolerable job and a miserable one is whether the containment was planned or improvised on the day: sealed openings, covered floors, and a route in and out that is not through your living room. Ask specifically what gets protected and how, and have it agreed before the first day rather than after the first mess.

I have kids and a dog.

Say so on the first call. It changes how the site gets closed off at the end of each day, which areas stay sealed while nobody is working, and where tools and materials are stored overnight. It is a normal request, not a complication, and it is much easier to plan than to retrofit.

What time will people be at my house?

Ordinary working hours, and towns set their own limits on when noisy work may happen, so it is not entirely up to anyone on site. If a shift, a baby, a tenant or a dog means the day needs to start later or stop earlier, say so before the schedule is set rather than on the first morning. It is easy to build in and awkward to change once trades are booked.

Who cleans up and hauls the debris?

Disposal is part of running the job rather than a separate surprise at the end, and it should appear in the written scope alongside everything else. If a bid does not mention debris removal anywhere, ask where it went — it is one of the more common things quietly left out to bring a number down.

I own a two-family with tenants in it.

Rhode Island's housing stock is full of two- and three-family houses. An occupied building changes the plan more than the scope does: tenant access, notice, noise windows, and phasing so units come back into use instead of all going dark at once. Say on the first call that it is occupied and how many units, because that shapes the sequence from the start.