Ground-up builds, additions and structural work, for commercial and residential clients. The measure is whether it stands up to daily use for years, not whether it photographs well on the day it is finished.
The site answers before the design does
People arrive at a build with a picture of a building. The first real conversation is almost never about the building.
It is about the ground it would sit on: what is under it, where the water goes, how far it has to be from the boundaries, whether waste can be dealt with, whether power and water can reach it, whether a truck can get in. Those answers set the envelope that any design has to live inside, and they are cheap to find out and expensive to discover.
That is true of an addition as much as a new house. The zoning check on an addition is the one that can change the whole idea rather than just the drawings, and it costs a phone call at the start and a redesign in the middle.
The site sets the envelope. The design lives inside it.
What gets checked before anything is designed
- The lot itself
- Size, shape, slope, what is already built on it, and how much more is allowed to be. In this state, also whether there is ledge under the topsoil, which changes excavation entirely.
- Zoning and setbacks
- How close you may build to each boundary, how tall, how much of the lot may be covered, and whether what you want needs relief from the town rather than just a permit.
- Waste and water
- Town sewer or a septic system, town water or a well. On a septic system the design capacity governs more than people expect, including how many bedrooms a house may have.
- Drainage
- Where surface water goes now and where it will go afterwards. Adding roof and paving to a lot changes that, and towns increasingly want to see how.
- Access and services
- The driveway, sight lines, how far power and water have to be run, and whether a delivery or a concrete truck can physically reach the work.
- Anything overlaid on the property
- Wetland buffers, coastal jurisdiction, a flood zone, an easement, a historic district. Any one of them is a separate approval with its own timetable.
How a build runs
Feasibility
The list above, answered. This is the stage that decides whether the project you have in mind is the project the site will take, and it happens before anybody is paid to draw anything.
Drawings
As much as the work and the town require. Structural changes and larger projects often need stamped drawings before a permit will issue; smaller work often does not, and that is checked early so you are neither paying for drawings that were never needed nor waiting on ones nobody ordered.
Scope, price and schedule in writing
What is included, what is excluded by name, how a change is raised, and payments tied to stages of work that are genuinely finished.
Permit
Filed with the town, with any separate approvals running alongside rather than behind. The registration number of whoever is doing the work goes on it.
Site, foundation, frame, envelope
Clear, excavate, foundation, frame, roof and weather barrier — the point at which the building can look after itself is the milestone the rest of the programme is planned around.
Rough-in and inspection
Mechanical, electrical and plumbing in, and looked at while they can still be seen. Nothing gets covered before it has been.
Finish, then walk it
Insulation, interior, finishes, final inspection, and a walkthrough where you write down what is not right before the job is called done.
The seasons are a real input
This is a climate that decides some of the schedule for you, and pretending otherwise is how programmes slip quietly.
Concrete has a real temperature floor and will not cure properly over frozen ground. Excavation in deep frost is slower and rougher. Exterior finishes, coatings and masonry have conditions attached to when they may be applied. On anything exterior, weather stops work at some point; what you are owed is not a promise that it will not happen but a call when it does and a revised date.
What that buys, planned for rather than fought, is a sensible order: get the building closed in before the cold, do the interior through the winter, and use the winter for the drawing and permitting of anything starting in spring. That is a way of working, not a guarantee about dates.
What protects you on a build
A larger job has more money in it, more trades on it and more time for something to go quiet. The protections are ordinary and they are worth insisting on from anyone.
- A scope with a list of exclusions
- The excluded page is the one that tells you whether two bids are comparable.
- Payments tied to finished stages
- So the money paid and the work done are looking at each other at any point, with a meaningful amount held until the list at the end is cleared.
- Changes in writing, before the work
- What changed, why, what it does to the price and what it does to the schedule — signed by both sides and dated.
- The registration number, checked
- Rhode Island requires contractors and most subcontractors to be registered with the state board, and a town will not issue a permit without it. Ask for the number — here or anywhere — and look it up yourself.
- A certificate of insurance from the agent
- With your name on it as certificate holder, and the dates checked. Ask every bidder for the same document.
- Who files the permit, and in whose name
- The permit holder is who the town looks to. Worth knowing which of you that is, before the work starts rather than after.
The four questions people actually ask
- Can you build an addition?The zoning check can change the whole idea, which is why it comes before the drawings.
- Do you build new houses?The first conversation is about whether the site works, not about finishes.
- Can you build an in-law apartment?A zoning question before a building one, and the zoning answer sets the design.
- Can work happen here in the winter?Interior work does not care what month it is. Exterior work cares a great deal.
Also asked
Do you work on commercial buildings or only homes?
Both. Commercial and residential, from single-unit work to larger properties.
What does project management mean here?
Someone holds the schedule, the trades and the budget together so you are not the one chasing them. That includes sequencing the work, keeping subcontractors to the plan, and telling you early when something changes rather than at the end.
Do you use subcontractors?
Most projects involve specialist trades, and the difference is whether someone is holding them to the plan. On a PSG job the coordination is the company's responsibility, not yours.
I don't have plans, just an idea.
That is a normal starting point, and most projects begin there rather than with a finished drawing set. The first conversation is about what you want to end up with; what drawings are needed after that depends on the scope and on what the town wants to see. Bring photos and a rough sense of the budget you have in mind, and it moves faster.
How long will my project take?
It depends on scope, permitting and how the property is set up, so a real timeline comes after someone has looked at the job. You get that schedule in writing along with the price, and you are told when it moves.
How soon could you start?
It depends on the work and on what is already booked, and nobody here is going to invent a date to keep you on the phone. Ask on the call and you get a real one, along with what would have to happen first — a site visit, a permit, a decision from you.
I own a two-family with tenants in it.
Rhode Island's housing stock is full of two- and three-family houses. An occupied building changes the plan more than the scope does: tenant access, notice, noise windows, and phasing so units come back into use instead of all going dark at once. Say on the first call that it is occupied and how many units, because that shapes the sequence from the start.
Do you work in Massachusetts or Connecticut?
Name the town and it is a short conversation. The reason it is a real question rather than a formality is that contractor registration is a state-by-state affair: each state runs its own, with its own rules for home improvement work, and a registration in one does not carry across a border. So the answer for any particular job turns on what is in place for that state, and the office can tell you straight away: (401) 405-8407.
Start with the town and the piece of ground.
The office answers within one business day.